Reducing costs and driving uptime: Next generation power and energy

Workloads are becoming increasingly complex and more compute power is needed than ever before to meet increasing digitisation. On top of this, energy efficiency commitments, speed and scale of deployments are creating additional challenges around design-build projects.
Driving innovative design and operational practice around cooling and power, can reduce downtime due to thermal shutdown and human error, minimize stranded capacity and extend the life of your data center by reducing both cost and square footage.

Tune into this debate to understand
  • The benefits of next generation (liquid) cooling and power for your data center
  • How to define the best solution and minimize cost across your workload mix
  • What the move towards 40-50kw loads means for design and cooling systems